Email from Harry Allen

The pool project is coming along really well.  The deck drains are installed.  The “lace” is applied to the southern half of the deck.  The northern half is getting the base coat this afternoon.  The entire deck will get the acrylic coating tomorrow, I think.

You will notice the deck drain is vastly better than the drains we saw when touring other projects.

The fencing is cut away temporarily to allow for installation of the drain and decking.

Leslie’s should be by to install a new pool light under warranty.  This must happen prior to filling it with water.

The county should be by to inspect the pool and spa drains and jet pump intake.  Once inspected, those projects can move forward.

The pillars are painted on the inside and the ramada project is also underway.

I leave for work before daybreak tomorrow.  Please update me with simple iPhone photos each day with the changes or if there are any issues that arise.

At the end of each day, please ensure CAUTION tape is blocking the construction zone.